1. |
Pre-tighten the bracket fixing bolt (A) in dash panel.
|
2. |
Install the brake booster and brake pedal member fixing nuts (A)
securely.
|
3. |
Tighten the bolt (A) securely in dash panel.
|
4. |
Install the snap pin (A) and clevis pin (B).
|
5. |
Install the stop lamp switch securely.
|
6. |
Connect the stop lamp switch connector (A).
|
7. |
Adjust the brake pedal height and free play.
|
8. |
Check the brake pedal operation after installing the brake pedal.
|
9. |
Install the shower duct (A).
|
10. |
Install the crash pad lower panel.
(Refer to Body - "Crash pad lower panel")
|
11. |
Reconnect the battery negative cable.
|
Installation
1.
Install the BCM unit.
2.
Install the center lower cover.
3.
Install the floor console assembly.
...
Operation
Evaporative System Monitoring
Evaporative And ORVR Emission Control System
This system consists of a fill vent valve, fuel shut-off valve, fuel cut
valve (for roll over), two way val ...
Canister Close Valve (CCV) Description
Canister Close Valve (CCV) is normally open and is installed on the canister
ventilation line. It seals evaporative emission control system by shutting the
canister from the atmosphere during ...