1. |
Disconnect the negative (-) battery terminal.
|
2. |
Disconnect the Electric Oil Pump (EOP) connector (A).
|
3. |
Remove the under cover after lifting the vehicle with lift. (Refer
to Engine Mechanical System - "Engine Room Under Cover")
|
4. |
Remove the Electric Oil Pump (B) after removing the bolts (A-4ea).
|
Components
1. Intake camshaft
2. Exhaust camshaft
3. Intake CVVT assembly
4. Exhaust CVVT assembly
5. Timing chain
6. Timing chain tensioner arm
7. Timing chain tensioner
8. T ...
Positive Crankcase Ventilation (PCV) Valve Installation
1.
Installation is reverse of removal.
PCV Valve installation:
1.96 ~ 2.94 N.m (0.2 ~ 0.3 kgf.m, 1.45 ~ 2.17 lb-ft)
...
Canister Close Valve (CCV) Inspection
1.
Turn the ignition switch OFF.
2.
Disconnect the CCV connector.
3.
Measure resistance between the CCV termina ...