1. |
Turn ignition switch OFF.
|
2. |
Disconnect the Solenoid valve connector.
|
3. |
Measure resistance between sensor signal terminal and sensor ground
terminal.
|
4. |
Check that the resistance is within the specification.
(Refer to SS-A Solenoid Valve - "Specifications")
|
AGM Battery Installation
1.
Install in the reverse order of removal.
When installing the battery, ...
Adjustment
Glass Adjustment
•
Check the glass run channel for damage or deterioration,
and repl ...
Injector Circuit Diagram
(M/T)
(A/T)
...