Kia Forte: Timing Chain Installation
1. |
Check that the TDC marks on the intake and exhaust CVVT sprockets
are slightly turned (about 2 to 3 teeth) from the TDC position after
the timing chain has been removed.
|
2. |
Turn the crankshaft about 2 to 3 teeth clockwise from the TDC
position (approx. 3° clockwise from the engine vertical line), by the
same amount of rotation as the intake CVVT sprocket from the TDC position.
|
3. |
Install the timing chain guide (A).
Tightening torque:
18.6 ~ 22.6 N.m (1.9 ~ 2.3 kgf.m, 13.7 ~ 16.6 lb-ft)
|
|
4. |
Install the timing chain tensioner arm (A).
Tightening torque:
18.6 ~ 22.6 N.m (1.9 ~ 2.3 kgf.m, 13.7 ~ 16.6 lb-ft)
|
|
5. |
Install the timing chain.
Crankshaft sprocket → Timing chain guide → Intake CVVT sprocket
→ Exhaust CVVT sprocket
(1) |
Install the timing chain with no slack between the crankshaft
sprocket and the intake CVVT sprocket.
The timing marks of each sprocket should be matched
with timing marks (color link) of timing chain when
installing the timing chain.
|
|
(2) |
Install the timing chain on the exhaust CVVT sprocket
with no slack while turning the CVVT assembly clockwise.
• |
The timing mark of the exhaust CVVT sprocket
should be matched with timing mark (color link)
of timing chain when installing the timing chain.
|
• |
Press down the timing chain links on the
exhaust CVVT sprocket to prevent the sprocket
from spinning.
|
|
|
|
6. |
Install the timing chain auto tensioner (A) and remove the stopper
pin (B).
Tightening torque:
9.8 ~ 11.8 N.m (1.0 ~ 1.2 kgf.m, 7.2 ~ 8.7 lb-ft)
|
• |
When installing the tensioner, check that the
ratchet of the tensioner functions normally after removing
the stopper pin by pushing the tensioner arm (A) as
close to the tensioner as possible as shown below.
|
• |
When the tensioner pluger is retracted maximally,
there should be no interference between the tensioner
arm (A) and the tensioner housing (B).
|
|
|
7. |
After rotating crankshaft 2 revolutions in regular direction (clockwise
viewed from front), confirm that the TDC marks on the intake and exhaust
CVVT sprockets are aligned with the top surface of cylinder head.
|
8. |
Install the other parts in reverse order of removal.
|
•
|
Refill engine with engine oil.
|
•
|
Clean battery posts and cable terminals and assemble.
|
•
|
Inspect for fuel leakage.
|
-
|
After assembling the fuel line, turn on the ignition switch
(do not operate the starter) so that the fuel pump runs for
approximately two seconds and fuel line pressurizes.
|
-
|
Repeat this operation two or three times, then check for
fuel leakage at any point in the fuel line.
|
|
Sprockets, Chain Tensioner, Chain Guide, Chain Tensioner Arm
1.
Check the CVVT sprocket and crankshaft sprocket for abnormal wear,
cracks, or damage. Replace if necessa ...