1. |
Connect the AVN head unit connectors and cables.
|
2. |
Install the AVN head unit.
|
3. |
Install the airvent ducts and fascia panel.
|
4. |
Connect the negative (-) battery terminal.
|
Instrument Cluster Components
Connector Pin Information
No.
Description
No.
Description
1
Alternator L output
21
Battery (+)
2
I ...
Oil Level Gauge & Pipe Removal and Installation
1.
Remove the oil level gauge (A).
2.
Install in the reverse order of removal.
...
Tightening Torques
Item
kgf.m
N.m
lb-ft
Positive crankcase ventilation valve installation
0.2 ~ 0.3
1.96 ~ 2.94
1.45 ~ 2.17
Canister install ...