1. |
Connect the GDS on the Data Link Connector (DLC).
|
2. |
Measure the output voltage of the FTPS.
|
Engine And Transaxle Assembly Installation
Installation is in the reverse order of removal.
Perform the following :
•
Adjust shift cable.
•
Adjust throttle cable.
•
...
Power Outside Mirror Switch Installation
1.
Install the driver power window switch and connectors.
2.
Install the front door trim.
...
Blower Resistor Inspection
1.
Measure terminal-to-terminal resistance of the blower resistor.
2.
If the measured resistance is not within specification, the blower
re ...