|
1. |
Install the control cable (B) and clip (A) on the bracket.
|
2. |
Install the washer (B) and pin (A).
|
3. |
Tighten the nut (B) after install the retainer (A).
|
4. |
Install the cable socket (A) on the shift lever assembly.
|
5. |
Install the shift cable (B) and clip (A).
|
6. |
Shift lever to "3rd".
|
7. |
Install the snap pin (A) after install the select cable (B).
|
8. |
Install the floor console assembly.
(Refer to Body - " Floor Console")
|
9. |
Install the battery and battery tray.
(Refer to Engine Electrical System - "Battery")
|
10. |
Install the air cleaner assembly.
(Refer to Engine Electrical System - "Battery")
|
Component Location
1. Quarter fixed glass
...
CVVT Oil Control Valve (OCV) Inspection
1.
Turn the ignition switch OFF.
2.
Disconnect the OCV connector.
3.
Measure resistance between the OCV termina ...
For best battery service
Keep the battery securely mounted.
Keep the battery top clean and dry.
Keep the terminals and connections clean, tight, and coated with petroleum
jelly or terminal grease.
Rinse any spi ...