1. |
Remove the engine cover.
|
2. |
Disconnect the battery negative terminal.
|
3. |
Disconnect the wiring connectors and harness clamps, and then
remove the wiring and protectors from the intake manifold.
|
4. |
Disconnect the positive crankcase ventilation (PCV) hose (A).
|
5. |
Disconnect the vacuum hose (A) and purge control solenoid valve
(PCSV) hose (B).
|
6. |
Unfasten the electric throttle body control (ETC) module bolts.
(Refer to Engine Control/Fuel System - "ETC (Electric throttle
body control) System")
|
7. |
Remove the intake manifold stay (A).
|
8. |
Remove the intake manifold (A) with the gasket (B).
|
9. |
Install in the reverse order of removal.
|
Rear Glass Defogger Switch Inspection
1.
The rear glass defogger switch inputs can be checked using the
GDS.
2.
To check the input value of rear glass defogger switch, select
...
Cylinder Head Installation
•
Thoroughly clean all parts to be assembled.
•
...
Specifications, Consumer information and Reporting safety defects
Engine
Dimensions
Bulb wattage
Tires and wheels
*1 : Normal load : Up to 3 persons
*2 : If your vehicle is not equipped with a compact spare tire, it will be equipped
with a Tire ...