1. |
Turn the ignition switch OFF.
|
2. |
Disconnect the HO2S connector.
|
3. |
Measure resistance between the HO2S terminals 2 and 5 [B1/S1].
Measure resistance between the HO2S terminals 3 and 4 [B1/S2].
|
4. |
Check that the resistance is within the specification.
|
Fuel Line Installation
•
Install the component with the specified torques.
•
...
Tail Gate Trim Component Location
(5Door)
1. Tail gate trim
...
CVVT Oil Control Valve (OCV) Specification
Item
Specification
Coil Resistance (Ω)
9.4~10.4 [20°C(68°F)]
...