Kia Forte: Relay Box (Passenger Compartment) Description
Smart Junction Box(SJB)
1. |
General function : Interior Junction Box + some functions of BCM
It controls loads with CAN communication and IPS.
|
2. |
Main function
A. |
Low speed CAN communication(100 kbps)
|
B. |
Self diagnostics(Lamp open/short)
|
C. |
Fail safe(When MCU/CAN is fail, Head lamp / Tail lamp
directly drive)
|
D. |
Protection of bulb over-voltage(PWM function)
|
E. |
Cut of Over-load and Short : PCL(Program Current Limit)
|
|
Auto cut system of dark current
1. |
Description : It cuts automatically power to be provided with
load for reducing useless dark current according to vehicle state.
|
2. |
SJB had 3 modes, "Normal Mode", "Sleep Mode", "Power Off Mode".
Auto cut of dark current practice in "Sleep Mode".
A. |
"Sleep" condition : IG OFF, constant input switch, CAN
network doesn't activate.
|
B. |
"Sleep" resolutive condition : Any switch inputs, CAN
network activates, KEY ON, IGN ON
|
C. |
"Power OFF" condition : The setting time of timer which
is used by cutting a load power expires.
|
D. |
"Normal Mode" : SJB function normally activates.
|
E. |
"Sleep Mode" : It is low power mode and activates for
reducing electricity consumption of SJB or IPM. Auto cut of
dark current function activates.
|
F. |
"Power OFF Mode" : Power of MCU and circumferential circuit
is cut for minimizing electricity consumption. Operation stops.
|
|
3. |
The explanation - The auto cut of dark current
Before delivering to customer
|
Fuse Switch
|
•All door close & RKE door lock or Constant switch
state
(Auto cut of dark current scenario starts.)
-After "sleep" state is for 20 min.
-SJB power down(SJB dark current : 200 μA) and cutting
power of Lamp/Body Load/Wake up
|
|
After delivering to customer
|
Fuse Switch
|
•All door close & Constant switch state : C_BAState=OFF
(Auto cut of dark current scenario starts.)
-After "sleep" state is for 20 min.
-SJB power down(SJB dark current : 200 μA) and cutting
power of Lamp Load
•In case RKE door lock : C_BAState=ON & Trunk SW=CLOSE
(Auto cut of dark current scenario starts.)
-After "Sleep" state 35s~65s (Waiting time of other
unit : 30~60s + SJB sleep counts 5s)
-SJB Powerdown(SJB dark current : 200 μA) and cutting
power of Lamp Load
|
|
|
4. |
Problem when fuse switch setting is wrong
: If a fuse switch is set to OFF(Before delivering to customer)
by a customer or technician and auto cut function of dark current activates,
below problems may happen.
Symptom
|
Related part
|
•Door lock/unlock, trunk open don't activate by
RKE.
(Wakeup of each module don't activate.)
|
BCM
|
•Digital clock is reset.(Memory is reset.)
|
Digital clock
|
•Setting value of audio(Volume, Frequency setting)
is reset.
(Memory is reset.)
|
Audio
|
*If fuse switch OFF(before delivering to customer) is set, power
of BCM, Digital clock and audio is shut off.
|
1.
Be sure there is no play in the fuse holders, and that the fuses
are held securely.
2.
Are the fuse capacities for each circuit correct? ...
See also:
Battery Specifications
Battery [Non-ISG type]
Item
Specification
Model type
CMF60L-DIN
Capacity [20HR / 5HR] (AH)
60 / 48
Cold Cranking Amperage (A)
...
Timing Chain Installation
1.
Check that the TDC marks on the intake and exhaust CVVT sprockets
are slightly turned (about 2 to 3 teeth) from the TDC position after
the timing chain has been rem ...
Installation
1.
Install in the reverse order of removal.
2.
Tighten the vacuum pump mounting bolts to the specified torque.
...