1. |
Check operating of lever of T/M side when operating shift lever
after assembly.
|
2. |
When shift lever to "R" position, check the position of "skirt".
|
3. |
When lever is shifted to each position, if stop occur between
two position, re-adjust select cable.
(Refer to Control cable - "Adjustment")
|
Variable Intake Solenoid (VIS) Valve Installation
•
Install the component with the specified torques.
•
...
Description
Automatic transaxle system relies on various measurement data to determine
the current control status and extrapolate the necessary compensation values.
These values are used to control the a ...
Cylinder Head Inspection
Cylinder Head
1.
Inspect for flatness.
Using a precision straight edge and feeler gauge, measure the
contacting surface of the cylinder block and the ma ...