1. |
Disconnect the negative (-) battery terminal.
|
2. |
Disconnect the power mosfet connector (A) and then remove the
power mosfet (B) after loosening the mounting screws.
|
3. |
Install in the reverse order of removal.
|
Transmitter Code Registration (Using GDS)
1.
Connect the DLC cable of GDS to the data link connector (16 pins)
in driver side crash pad lower panel, turn the power on GDS.
2.
...
Canister Close Valve (CCV) Description
Canister Close Valve (CCV) is normally open and is installed on the canister
ventilation line. It seals evaporative emission control system by shutting the
canister from the atmosphere during ...
Glove Box Housing Replacement
•
Put on gloves to protect your hands.
&n ...