1. |
Turn the ignition switch OFF.
|
2. |
Disconnect the PCSV connector.
|
3. |
Measure resistance between the PCSV terminals 1 and 2.
|
4. |
Check that the resistance is within the specification.
|
Tightening Torques
Engine Control System
Item
kgf.m
N.m
lb-ft
ECM installation bolt
0.8 ~ 1.2
7.8 ~ 11.8
5.8 ~ 8.7
ECM bracket ins ...
Battery Installation
1.
Install in the reverse order of removal.
Battery (-)terminal installation:
4.0 ~ 6.0 N.m (0.4 ~ 0.6 kgf.m, 3.0 ~ 4.4 lb-ft)
...
Oil Pump Unit (OPU) Inspection
OPU Problem Inspection Procedure
1.
TEST OPU GROUND CIRCUIT: Measure resistance between OPU and chassis
ground using the backside of OPU harness connector ...